Medium Usage PROJECT

How we helped Samin Metal.

System Details.

Warning: count(): Parameter must be an array or an object that implements Countable in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 39

Warning: Invalid argument supplied for foreach() in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 40
System Overview.

Warning: count(): Parameter must be an array or an object that implements Countable in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 54

Warning: Invalid argument supplied for foreach() in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 55

After meeting with Wade, we discovered they had already installed the LED High bay Lights and a power factor correction device to drive down their peak demand energy costs down.
We completed a detailed data analysis and load profiling which identified their kVA demand was for only a short period of time.

We looked at a commercial solar power system on the demand tariff and the payback was too long. Wade wanted a solution to move them away from the kVA demand tariff and this is where tariff optimisation really worked for their business.

Watch video

We needed a solution to get us off the kVA Demand Tariff and simplify my cost

Saving you money through tariff optimization.

Through years of experience with tariff optimisation and solar installation, our mission has been to help Queensland businesses reach energy independence. Ensuring your business is on the right tariff can mean significant savings. At Energy Partners, we will analyse your business’ electrical data to work out the right tariff for you.
Energy for the future

Long term savings at a low cost per kWh.


Warning: count(): Parameter must be an array or an object that implements Countable in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 114

Warning: Invalid argument supplied for foreach() in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 115

Warning: Illegal string offset 'caption' in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 137
9, 1, 1
IT’S ALL IN THE DETAILS

Solar Design.


Warning: count(): Parameter must be an array or an object that implements Countable in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 155

Warning: Invalid argument supplied for foreach() in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 156
NO SHORT CUTS

Installation.

This project is along the Logan Motorway, where it can be quite dusty from the traffic each day. We have utilised the Canadian Solar embedded panels, connected to the SolarEdge Inverters. SolarEdge panel level monitoring is designed to track performance of each panel and will allow the owner to identify when cleaning is required. We have made sure that the solar panels have enough service gaps between rows to cater for maintenance.

Brands we partner with.