Low Usage PROJECT

How we helped the Sesame Lane.

System Details.

Warning: count(): Parameter must be an array or an object that implements Countable in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 39

Warning: Invalid argument supplied for foreach() in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 40
System Overview.

Warning: count(): Parameter must be an array or an object that implements Countable in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 54

Warning: Invalid argument supplied for foreach() in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 55

After meeting with the management team at Sesame Lane Childcare Group, we designed a system and showed them how reducing energy consumption was going to save them over 50% of their energy usage.
We also talked to them about delivering a fun, educational, and interactive show to the children about where electricity comes from and how solar works, plus we installed a monitoring screen in their reception with live energy data.

Watch video

Energy Partners not only install solar systems in child care centres to halve their energy bills, but to create powerful interactive educational experiences

Saving you money through tariff optimization.

Through years of experience with tariff optimisation and solar installation, our mission has been to help Queensland businesses reach energy independence. Ensuring your business is on the right tariff can mean significant savings. At Energy Partners, we will analyse your business’ electrical data to work out the right tariff for you.
Energy for the future

Long term savings at a low cost per kWh.


Warning: count(): Parameter must be an array or an object that implements Countable in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 114

Warning: Invalid argument supplied for foreach() in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 115

Warning: Illegal string offset 'caption' in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 137
1, 1, 1
IT’S ALL IN THE DETAILS

Solar Design.


Warning: count(): Parameter must be an array or an object that implements Countable in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 155

Warning: Invalid argument supplied for foreach() in /home/customer/www/energypartners.com.au/public_html/wp-content/themes/Divi-child/single-project.php on line 156
NO SHORT CUTS

Installation.

This project is a classic example of the flexibility the SolarEdge Technology offers over typical string inverters. We chose to utilise the SolarEdge integrated PV equipment to provide high transparency of system performance and Safe-DC enables panel shutdown to 1 volt DC when the inverter is not operating. Potential faults are reported, detected and located through the SolarEdge monitoring portal allowing effective preventative maintenance. The monitoring has a playback feature to identify panel issues or performance drops The SolarEdge DC Optimised inverter maximises power generation at the individual panel-level while lowering the cost of energy production by the PV system for a higher return on investment.

Brands we partner with.